Cost segregation case study CS-05

New-construction retail and warehouse on a large site

A cost segregation study on a 2024 new-construction retail, office, and warehouse building reclassified 61.3% of costs, and giving the site work its own earlier placed-in-service date moved several hundred thousand dollars into 2024 at 60% bonus depreciation instead of 40%.

Property profile

Property type
Retail, office, and warehouse
Region
Southeast
Year built
2024
Building size
~8,700 SF
Site size
~21 acres
Study type
New construction
Tax year
2024 site / 2025 building

Study outcome

Total reclassified
61.3%
5-year property
2.4%
15-year property
58.9%
Bonus rate
60% / 40%
Accelerated depreciation
~$1,947,000 through 2025

The property

A new metal building on a large site: about 30% retail with a mezzanine for offices and training above it, and the rest unconditioned warehouse.

What we found

Most of the project cost was site work, including a large concrete yard, storm drainage, erosion control, and utilities. The construction ledger and contractor records showed the site improvements were placed in service about six months before the building's certificate of occupancy. Giving them their own in-service date moved several hundred thousand dollars into 2024, when bonus depreciation was 60% instead of 40%, and the owner amended that year's return to capture it.

View all cost segregation case studies

Results are specific to each property and tax situation and are not a projection for your property.